JIRA Agile 6.6.70 changes the terms "Plan mode", "Work mode", and "Report mode" to "Backlog", "Active sprints"/"Kanban board", "Reports" respectively. For more information, see the JIRA Agile 6.6.70 release notes.

Skip to end of metadata
Go to start of metadata

Upgrading from GreenHopper 5.8.x to 5.8.3

Please follow the upgrade instructions in the GreenHopper Installation and Upgrade Guide, plus note the following:

Compatible with JIRA 4.4.3 only

GreenHopper 5.8.3 is only compatible with JIRA 4.4.3.

Re-index required

Please re-index JIRA after ugrading to GreenHopper 5.8.3.

Upgrading from GreenHopper 5.7.x or earlier

In addition to the above, please read the GreenHopper 5.8 Upgrade Notes and the Upgrade Notes for every version you are skipping during the upgrade. The complete list of Upgrade Guides is available here.