[Bamboo Knowledge Base]
A plan:
Every plan belongs to a project.
Projects and plans can only be configured by Bamboo administrators (see Creating a plan).
On this page:
Choose Build > All build plans from the Bamboo header, then click the edit icon () for the plan you want to edit.
The plan's configuration is found on several tabs:
Click a tab to configure that aspect of your plan:
Plan details | A plan's Project Key and Plan Key are not editable once the plan is created, however see Moving plans to a different project. |
Stages | See Using stages in a plan. |
Repositories | See Linking to source code repositories. |
Triggers | See Triggering builds. |
Branches | See Using plan branches. |
Dependencies | See Setting up build dependencies. |
Permissions | See Configuring a plan's permissions. |
Notifications | See Configuring notifications. |
Variables | See Defining plan variables. |
Miscellaneous | See Configuring expiry of a plan's build results. |
Audit log | A record of changes to the plan's configuration. This feature is disabled by default. To enable it, please go to Administration > System > Audit Log. |