Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 5.3

The 'Workload Pie Chart' report displays the relative workload for assignees of all issues in a particular project or issue filter.

Note

Note: this report is only available if your JIRA administrator has enabled time-tracking and installed the JIRA Charting Plugin.

On this page:

Table of Contents

What does the 'Workload Pie Chart' report look like?

The report generated will look something like this:

Screenshot: 'Workload Pie Chart' report

Generating a 'Workload Pie Chart' report

To generate a user workload report:

  1. On the top navigation bar, click the white triangle next to 'Projects'. The projects dropdown will display.
    (tick) Tip: If you click on the 'Projects' link instead of the triangle, the summary for your current project will display.
  2. Click the project that you wish to browse. If it is not displayed in the dropdown, click 'View All Projects' — you will be able to view a list of all projects set up in your JIRA instance and select your project from there. (The choice of project will not affect the report.)
  3. Click the 'Reports' menu on the right of the page and click 'Workload Pie Chart Report' from the dropdown menu that displays. The following form will appear:
  4. Select the project or issue filter for which you wish to generate a Workload Pie Chart report.
  5. In the 'Statistic' drop-down list, select the field on which the pie chart will be based (this will usually be Assignee).
  6. Click 'Next' to generate the report (see screenshot in previous section above).
Include Page
__charting_configure-ie
__charting_configure-ie