Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 5.3
Excerpt

A control chart shows the cycle time for your product, version or sprint. The horizontal x-axis in a control chart indicates time, and the vertical y-axis indicates cards (issues).

A control chart helps you identify whether data from the current sprint can be used to determine future performance. The less variance in the cycle time of an issue, the higher the confidence in using the mean as an indication of future performance.

 

See Viewing the Control Chart.