You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
Version 1
Current »
If the results of a plan builds are no longer required, you can completely remove the them from your Bamboo system. The results include all the results of all job builds that were processed as part of an individual plan build (with a specific build number).
Deleting the Results of a Plan Build
Before you begin:
To delete the result of a Plan build:
- Navigate to the desired Plan, as described in Configuring a Plan.
- Click the 'History' tab. A table of the previous Plan build results will be displayed, with the most recent builds at the top of the table.
- Locate the desired build result and click the
bambooicon-trashcan.gif (trash) icon (see screenshot below). - Confirm the removal of the Plan build result. The Plan build result and any artifacts generated as a result of the Plan build's execution will be deleted.
Screenshot: Build History of a Plan listing individual Plan build results
bamboo_plan-history (cropped).png
Notes
Deleting a Job's Current Working Files