This is the documentation for Bamboo 5.7. View this page for the

Unknown macro: {spacejump}

of Bamboo, or visit the latest Bamboo documentation.

Bamboo provides a summary of test results across all of a job's builds. This helps you to:

  • Troubleshoot by identifying which tests fail most frequently, and which tests take longest to fix.
  • Manage your build duration by identifying the plan's slowest running tests.
  • Ensure quality by monitoring the number of tests over time: are your test cases growing with your code base?

Related pages:

To view the test statistics for all of a job's builds:

  1. Navigate to the desired build result page, as described in Viewing a build result.
  2. Click the Tests tab.
  3. Click the sub-tabs to filter the rest statistics (see screenshots below).
    • To view a test's history, click the test name.

Screenshot: Test statistics for a job