Bamboo 3.4 has been released. Read the Bamboo 3.4 Release Notes and Upgrade Guide.
Don't have Bamboo 3.4? Take a look at the features of Bamboo's latest major version and try it out!
27 March 2008
Before upgrading, please read the Bamboo 2.0 Beta 8 Upgrade Guide (Please note that there is no 2.0 Beta 7). If you are upgrading from a version of Bamboo prior to the Bamboo 2.0 Beta, please read all of the Bamboo 2.0 Beta Release Notes and Bamboo 2.0 Beta Upgrade Guides before upgrading. By popular request, Quiet Period parameters can now be specified for Subversion and Perforce when configuring a source repository for a build plan. You can choose to set how long Bamboo should wait after a commit before triggering a build, and the number of times it retries before initiating a build. Read more about configuring Subversion and Perforce source repositories. Also by popular request, you can now force Bamboo to run 'Clean Builds' in a build plan. That is, the source directory is removed and then checked out from the repository prior to each build. Read more about this function in Specifying a Plan's Source Repository.
Atlassian is proud to announce the release of Bamboo 2.0 Beta 8. This point release includes more than 20 minor fixes and improvements. Bamboo 2.0 Beta 8 can be downloaded here.
Quiet Period Functionality Supported for Subversion & Perforce
'Force Clean Builds' Supported
The following issues are applicable at the time of the Bamboo 2.0 Beta 8 release. Please refer to each of the previous beta release notes to review the complete list of issues and fixes for each beta release.
Please help us with the final 2.0 release by reporting any bugs and issues you find, in the Bamboo project at jira.atlassian.com.