You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
Version 1
Current »
If the results of a Plan build* is no longer required, you can completely remove it from your Bamboo system. The 'results of a Plan build' (also known as a Plan build result) includes the results of all Job builds that were processed as part of an individual Plan build (with a specific build number).
Deleting the Results of a Plan Build
Before you begin:
To delete the result of a Plan build:
- Navigate to the desired Plan, as described in Configuring a Plan.
- Click the 'History' tab. A table of the previous Plan build results will be displayed, with the most recent builds at the top of the table.
- Locate the desired build result and click the 'Delete' (
) icon (see screenshot below).
- Confirm the removal of the Plan build result. The Plan build result and any artifacts generated as a result of the Plan build's execution will be deleted.

Screenshot above: Build History of a Plan listing individual Plan build results
Notes
Deleting a Job's Current Working Files