This is the documentation for Bamboo 5.6. View this page for the

Unknown macro: {spacejump}

of Bamboo, or visit the latest Bamboo documentation.

Triggering the build of a plan to run at a particular time each day is one of the available methods for triggering builds in Bamboo.

A "Single daily build" runs at a time of your choice. This is particularly suitable for builds that take a long time to complete.


To schedule a plan build at a specified time each day:

  1. Click Dashboard and then the All Plans tab.
  2. Locate the plan in the list and click the edit icon to display the plan's configuration pages.
  3. Click the Triggers tab, then click either an existing trigger or Add Trigger.
  4. Optionally, enter a trigger description.
  5. Choose Trigger type > Single daily build.
  6. Specify the time of day at which the build should run In Build Time. Use hh:mm format, with a 24-hour clock.
  7. Click Save Trigger.