Child pages
  • Advanced ways to work with Test Sessions

JIRA Capture (previously Bonfire) is now called Capture for JIRA. Learn more.

Skip to end of metadata
Go to start of metadata

Redirection Notice

This page will redirect to Capture for JIRA Documentation in about one second.

  • No labels

4 Comments

  1. Generic question:

    How can I move an existing test session to a different story?

     

    More specific question:

    We have an app for iOS and Android. In jira, we have 1 project, but keep each requirement in 2 stories - one for android and one for iOS. When I create a test session in the Android story, what's the quickest way to copy this test session to the related iOS story?

     

    For now, I help myself by relating this 1 test session to both stories (button "edit session" in test session detail view). But separate test sessions would definitely be the better way to do it.

    1. I would very much like to use this feature either.

  2. Can you re-open a closed session that was closed in error?

  3. I would really like a feature that lets me prioritise sessions in the same way that issues are prioritised in JIRA (smile)